Name of work
Mechanical Erection works for Gail Pata Gas Cracker & Processing Unit.

Site
Pata. U.P.

Client
M/s Gas Authority of India Limited, New Delhi.

Customer
M/s Gas Authority of India Limited, New Delhi

Consultant
M/s. EIL, New Delhi.

Project Duration
20 Months.

Our Scope of Work
  • Fabrication & Erection of Piping & related Civil works.
  • Erection of Equipments, Stack, Structural and Centrifugal Compressors.

Date of Completion
December 1997
Name of work
Electro Mechanical Erection works for Gail Gandhar Gas Processing Unit.

Site
Gandhar. U.P.

Client
M/s Gas Authority of India Limited, New Delhi.

Customer
M/s Gas Authority of India Limited, New Delhi

Consultant
M/s. EIL, New Delhi.

Project Duration
18 Months

Our Scope of Work
  • Fabrication & Erection of Piping & related Civil works.
  • Erection of Equipments, Structural, RCC, Cold Insulation fausse sacoche pas cher and Painting.
  • Supply & Installation of Transformers, Panels & Switch board.
  • Installation of Cable, Cable Tray, Termination & Lighting.

Date of Completion
May 2001
Name of work
Electro Mechanical Erection works for Ravva Satellite Gas development Project at Amalapuram, A.P.

Site
Amalapuram, A.P.

Client
M/s. Clough Engineering Limited, Australia.

Customer
M/s. ONGC , M/s. Cairn Energy, M/s. Videocon Petroleum Ltd, M/s. Ravva Oil (Singapore)

Project Duration
12 months.

Our Scope of Work
Supply, Fabrication & Erection of Piping, Equipment, and Structural works.
Supply & Installation of Cables, Cable Trays and Earthing.

Date of Completion
November 2001
Name of work
Electrical and Instrumentation installation works for ONGC G1 & GS15 Fields Development Project at Amalapuram, AP.

Site
Amalapuram, AP.

Client
M/s. Clough Engineering Limited, Australia.

Customer
M/s. ONGC.

Project Duration
12 months.

Our Scope of Work
Installation of Swithchgear, Cables, Cable Trays, Termination, Electrical Equipments, Panels, Instruments Installation, and Instrument cable, Field Instruments & Instrument loop checking.

Date of Completion
March 2008
Name of work
Mechanical Erection works for SPIC LPG Project at, Tuticorin, Madurai, Madras.

Site
Tuticorin, Madurai and Madras,

Client
M/s. SPIC Petroleum Division Tuticorin.

Customer
M/s. SPIC Petroleum Division Tuticorin.

Project Duration
14 months.

Our Scope of Work
  • Fabrication & Erection of 9 Kms. 14” LPG Pipe Line.
  • Erection of Equipments and Structural.

Date of Completion
April 1995
Name of work
Electro Mechanical Erection works for Oil Collecting Station of ONGC at Ramnad, Tamilnadu.

Site
Ramnad, Tamilnadu.

Client
M/s. ONGC.

Customer
M/s. ONGC.

Project Duration
9 months.

Our Scope of Work
  • Design, Supply, Fabrication & Erection of Storage Tanks and Water Seal Drum.
  • Erection of Equipments, Piping, Piping Supports, and Structural.
  • Installation of Transformer, Cabling, Cable Trays and Termination.

Date of Completion
August 2002
Name of work
Electro Mechanical Erection works for Ravva Satellite Gas Development Project at Amalapuram, A.P.

Site
Amalapuram, A.P.

Client
M/s. Cairn Energy India Pty. Ltd.

Customer
M/s. ONGC, M/s. Cairn Energy, M/s. Videocon Petroleum Ltd.

Project Duration
7 Months.

Our Scope of Work
  • Erection of Equipments, Piping, Piping Supports, Structural and Civil Earthworks.
  • Installation of Instrumentation Cabling, Cable Trays and Termination.


Date of Completion
January 2004
Name of work
Civil works for Niko Dew Point Control unit project

Site
Hazira

Client
M/s.Technip,Chennai.

Customer
M/s. NIKO Resources.

Consultant
M/s.Technip,Chennai.

Project Duration
4 months.

Our Scope of Work
Civil Woks for Substation, DG Room and Civil foundation for Equipments.

Date of Completion
June 2004
Name of work
Mechanical Erection works for ONGC Offshore Platforms in Mumbai.

Site
Mumbai.

Client
M/s. ONGC.

Customer
M/s. ONGC.

Project Duration
3 months.

Our Scope of Work
  • Removal of Old Gratings, Handrails and Chequered Plates.
  • Erection of Gratings, Handrails and Chequered Plates.

Date of Completion
February 2003
Name of work
Mechanical works for Sulphur Recovery Unit (SRU) 3 Trains at Reliance Jamnagar Refinery Expansion project.

Site
Jamnagar.

Client
M/s. Reliance Refinery Limited, Jamnagar.

Customer
M/s. Reliance Refinery Limited, Jamnagar.

Project Duration
15 Months.

Our Scope of Work
Erection of Piping and Structural works.

Date of Completion
March 2008
Name of work
Mechanical Erection Works for Fluid Catalytic Cracker Unit of HPCL Vizag Refinery Expansion Project.

Site
Vizag. Refinery, A.P.

Client
M/s HPCL, Vizag

Customer
M/s HPCL, Vizag

Consultant
M/s. Engineers India Ltd (EIL), New Delhi.

Project Duration
20 Months

Our Scope of Work
Erection of Piping, cement Lined Piping, Equipments and Civil works.

Date of Completion
June 2000
Name of work
Mechanical Erection works for Hydro cracker(HCU) and Merox Units of Chennai Petroleum Corporation Limited (CPCL)'s Expansion - III Project at Manali.

Site
Manali, Chennai

Client
M/s. CPCL, Chennai.

Customer
M/s. CPCL, Chennai.

Consultant
M/s. Engineers India Ltd (EIL), New Delhi

Project Duration
11 months

Our Scope of Work
  • Fabrication & Erection of Piping. rolex replica watches
  • Erection of Static Equipment, Rotary Equipment, Pressure vessels, Heat Exchanger and Structural.

Date of Completion
August 2004
Name of work
Fabrication and Erection of Hot Oil, Fired Combustion & Xylene Reboiler Heaters (PX2) for IOCL Expansion Project.

Site
IOCL, Panipat.

Client
M/s. LARSEN AND TUBRO LTD MUMBAI

Customer
M/s. IOCL, Panipat Refinery.

Consultant
M/s. Technip

Project Duration
9 months.

Our Scope of Work
Onsite Fabrication & Erection of Hot Oil, Fired Combustion & Xylene Heaters.

Date of Completion
Jun 2005
Name of work
Mechanical works for Light Naptha Unifying Unit / Selective Hydrogenation Process / Tertiary Amile Methyl Ether Units.

Site
Jamnagar, Gujarat.

Client
M/s Reliance Industries, Jamnagar, Gujarat.

Customer
M/s Reliance Industries, Jamnagar, Gujarat.

Project Duration
14 months.

Our Scope of Work
Fabrication & Erection Piping works. Erection of Structural & Equipments.

Date of Completion
December 1999
Name of work
Electrical Works for HCU unit at IOCL Panipat Refinery Expansion project.

Site
IOCL, Panipat.

Client
M/s. Daelim Industrial Co. Ltd., Korea.

Customer
M/s. IOCL, Panipat Refinery.

Consultant
M/s. Daelim Industrial Co. Ltd., Korea.

Project Duration
14 Months.

Our Scope of Work
Installation of Transformer, Switchgear, MCC Panels, Cable Tray, 6.6KV Power Cable, 6.6 KV Bus Duct, 600 V Power Cable, Lighting Fixture, Switch & Receptacle and Fire Fighting.

Date of Completion
December 2005
Name of work
Mechanical Erection works for Naptha Splitter Unit at IOCL Mathura Refinery Expansion Project.

Site
IOCL Mathura.

Client
M/s. Toyo Engineering India Ltd.,

Customer
M/s. IOCL Mathura Refinery.

Consultant
M/s. Toyo Engineering India Ltd.

Project Duration
6 months.

Our Scope of Work
Supply, Fabrication & Erection of Piping, Structural, Equipments and Painting works.

Date of Completion
May 2005
Name of work
Mechanical Erection works for NHTU Revamp IOCL Expansion Project

Site
IOCL Mathura.

Client
M/s. Technip KT India Ltd., New Delhi.

Customer
M/s. IOCL Mathura Refinery.

Consultant
M/s. Technip KT India Ltd., New Delhi.

Project Duration
4 months

Our Scope of Work
  • Fabrication & Erection Hydrogen Reformer.
  • Erection of Structurals, Piping, Naptha Super Heater, Reactor Feed Heaters, Equipments, Gratings and Painting.

Date of Completion
May 2004.
Name of work
Composite Works for Stand-by Sulphur Recovery Unit Project at Panipat Refinery.

Site
IOCL, Panipat.

Client
M/s. IOCL, Panipat Refinery.

Customer
M/s. IOCL, Panipat Refinery.

Consultant
M/s. EIL, New Delhi.

Project Duration
9 months.

Our Scope of Work
  • Erection of Piping, Structural, Equipments and Insulation works.
  • Electrical, and Control & Instrumentation works.
  • Civil Works.

Date of Completion
January 2001
Name of work
Electrical works for DHDT Unit of IOCL Barauni Refinery, Bihar

Site
Barauni, Bihar.

Client
M/s.Samsung Engineering Co. Ltd., Korea.

Customer
M/s. IOCL, Barauni, Bihar.

Consultant
M/s. EIL, New Delhi.

Project Duration
7 months.

Our Scope of Work
Installation of 2000 KVA/ 300 KVA Transformer.
Installation of HT & LT Panels.
Installation of Motor Control Center, Cable Tray, Cabling, Termination, Lighting, Telephone and Fire Alarm Systems.

Date of Completion
April 2001
Name of work
Mechanical Erection of Flare System for IOCL Mathura Refinery.

Site
IOCL, Mathura.

Client
M/s. Airoil - Flaregas (I) Pvt. Ltd.

Customer
M/s. IOCL Mathura Refinery

Consultant
M/s. EIL, New Delhi.

Project Duration
4 months

Our Scope of Work
Erection of Water Seal Drum (6.4 mtr. Width x 16 mtr. Height),
Knockout Drum (2.9 mtr width x22 mtr. Height) and Derrick Structure.

Date of Completion
May 2004
Name of work
Composite Works for provision of additional Caustic Tanks, Pumps and Blower of CGP Plant for IOCL Expansion project at Gujarat.

Site
Vadodara, Gujarat.

Client
M/s. IOCL Vadodara Refinery.

Customer
M/s. IOCL Vadodara Refinery.

Consultant
M/s. EIL, New Delhi.

Project Duration
2 months.

Our Scope of Work
  • Erection of Fixed Roof Tanks, Structural and Equipments.
  • Electrical & Instrumentation Cabling works.
  • Civil Earthworks, RCC & RFCC works.

Date of Completion
December 2003
Name of work
Mechanical & Piping works for Rare Earth Extraction Plant at TREI, Vizag

Site
Vishakapatnam, AP, India.

Client
M/s. Toyo Engineering India Ltd., Mumbai

Customer
M/s. Toyotsu Rare Earth India Ltd (a JV of Toyotsu-Japan

Consultant
M/s. Toyo Engineering India Ltd., Mumbai

Project Duration
12 Months

Our Scope of Work
Site fabrication & erection of API 650 grade storage tanks, erection of static rotary & package equipments, piping & allied painting parrucche cosplay works.

Date of Completion
2012
Name of work
Electrical & Instrumentation Works For Strategic Storage of Crude Oil at ISPRL

Site
Padur, Karnataka, India

Client
M/s. Linde Engineering India Private Limited

Customer
M/s. Indian Strategic Petroleum Reserves Ltd (ISPRL)

Consultant
M/s. Engineers India Limited, New Delhi

Project Duration
24 Months

Our Scope of Work
Supply of small Electrical items, Erection & Installation of Electrical equipments, laying of cables, Cable trays, etc Testing and Installation of Instruments, etc.

Date of Completion
March 2015
Name of work
Electrical & Control Instrumentation Works in MEG unit (Mono Ethylene Glycol Unit) of C2 complex at RIL Jamnagar Refinery, Gujarat

Site
Jamnagar Refinery, Gujarat, India

Client
M/s. Reliance Industries Ltd - Jamnagar Refinery

Customer
M/s. Reliance Industries Ltd - Jamnagar Refinery

Project Duration
Electrical works : 12 Months Instrumentation works : 12 Months

Our Scope of Work
Electrical works
Instrumentation works


Date of Completion
2017
Name of work
Electrical & Instrumentation Works for Gasoline Upgrade Project for RIL Jamnager Refinery

Site
Jamnagar Refinery, Gujarat, India

Client
M/s. Reliance Industries Ltd - Jamnagar Refinery

Customer
M/s. Reliance Industries Ltd - Jamnagar Refinery

Project Duration
8 months

Our Scope of Work
C&I works: Installation of Temperature instruments, Pressure instruments, Flow/DPT instruments, Level Instruments, etc., Instrument cable laying , Cable trays, JBs, Calibration/Testing of Instruments, Dry loop checking & minor associated civil works
Electrical Works: Transformers(above 1 MVA, but up to 3 MVA), Cable trays,  HT & LT Cable laying and Termination, HV&LV Bus ducts, minor associated civil works, Plant Lighting works , LV Equipments, JBs.

Date of Completion
2015
Name of work
Electrical, Instrumentation & Telecom Installation Works (RDG Plant & New Well Pads 08,09 & 11) for Integrated Gas Surface Facilities of Raageshwari Deep Gas Field Development Project of Vedanta Limited at Barmer Dist., India

Site
Barmer, Rajasthan

Client
M/s. Petrofac International (UAE) LLC

Customer
M/s. Vedanta Ltd (Cairn Oil)

Project Duration
9 Months

Our Scope of Work
(RDG Plant & New Well Pads 08,09 & 11)
 - Associated Civil works
 - Electrical works,
 - Instrumentation works
 - Telecom Installation works
Rolex DateJust  Replica prada handbags

Date of Completion
Completed

orange.php8
Name of work
Piping and Mechanical works for HGU-205 in RLNG Project at Manali Refinery of CPCL, Chennai

Site
Manali, Chennai

Client
M/s. CPCL, Chennai.

Customer
M/s. CPCL, Chennai.

Project Duration
5 Months

Our Scope of Work

Piping and Mechanical Works Rolex DateJust  Replica prada handbags

Çocuk Masalları Prenses Masalları Hikaye Oku


Date of Completion
Completed