EPC & Turnkey
EPC & TURNKEY PROJECTS
Name of work
400 KV GIS for 2 x 600 MW Mutiara Thermal Power Project at Tuticorin, Tamil Nadu
Site
Tuticorin, Tamil Nadu, India
Client
M/s. Coastal Energen Private Ltd, Chennai
Customer
M/s. Coastal Energen Private Ltd, Chennai
Project Duration
30 months
Our Scope of Work
Engineering, Supply, Erection, Testing and Commissioning of 400KV GIS with Double Bus system consisting of Eight working bays/ Circuits, and space/other provision for one extra bay, potyard equipments and main Transformer yard equipments
Date of Completion
2014
Name of work
Sea Water Flue Gas De sulphurising System(FGD) for 4 X 300 MW JSW Ratnagiri Thermal Power Plant Project
Site
Ratnagiri, Maharashtra, India
Client
M/s. JSW Energy (Ratnagiri) Ltd
Customer
M/s. JSW Energy (Ratnagiri) Ltd
Project Duration
32 Months
Our Scope of Work
Engineering, Supply & Erection of Sea Water Flue Gas De sulphurising System on turnkey basis.
Date of Completion
2013
Name of work
LSTK of Balance of Plant (BoP) packages and Erection, Testing & Commissioning of BTG & its Auxiliaries for 4 x 300 MW Thermal Power Plant Project
Site
Ratnagiri, Maharashtra, India
Client
M/s. JSW Energy (Ratnagiri) Ltd
Customer
M/s. JSW Energy (Ratnagiri) Ltd
Project Duration
42 Months
Our Scope of Work
- Erection of BTG & its Auxiliaries, ESP
- Design, Engineering, Supply and Erection of Balance of Plant (BoP) Packages
- Coal Handling Plant
- Ash Handling Plant
- Cooling Water System
- HVAC System
- Piping
- Air Compressor System
- Fire Fighting System
- Fuel Oil Unloading system
- Miscellaneous packages, Civil works BoP
- Electrical BoP (E-BoP) and associated Control & Instrumentation works
Date of Completion
2011
Name of work
LSTK of Balance of Plant (BoP) packages and Erection, Testing & Commissioning of BTG & its Auxiliaries for 2 x 300 MW Thermal Power Plant Project
Site
Toronagallu, Bellary District, Karnataka, India
Client
M/s. JSW Energy (Vijayanagar) Ltd
Customer
M/s. JSW Energy (Vijayanagar) Ltd
Project Duration
32 Months
Our Scope of Work
- Erection of BTG & its Auxiliaries, ESP
- Design, Engineering, Supply and Erection of Balance of Plant (BoP) Packages
- Coal Handling Plant
- Ash Handling Plant
- Cooling Water System
- HVAC System
- Piping
- Air Compressor System
- Fire Fighting System
- Fuel Oil Unloading system
- Miscellaneous packages, Civil works BoP
- Electrical BoP (E-BoP) and associated Control & Instrumentation works
Date of Completion
2009
Name of work
LSTK of 5000 TPH Conveyor system for SICAL Iron Ore Port terminal at Ennore Port, Chennai
Site
Ennore Port, Chennai, Tamil Nadu, India
Client
M/s. Sical Iron Ore (Ennore) Terminal Ltd., Chennai
Customer
M/s. Sical Iron Ore (Ennore) Terminal Ltd., Chennai
Project Duration
27 Months
Our Scope of Work
Design, Engineering, Civil works, Procurement and Construction of 5000 TPH Iron ore conveying system for a distance of 6.6 Kms at a height of 15 Mtrs.
Date of Completion
2011
Name of work
Mechanical Erection works for 20 MW Captive Thermal Power Project
Site
Malkhed, Karnataka, India
Client
M/s. Rajashree Cements, Malkhed, Karnataka.
Customer
M/s. Rajashree Cements, Malkhed, Karnataka.
Project Duration
18 Months.
Our Scope of Work
Erection of Boiler, TG Set, Supports fake prada and LP Piping.
Date of Completion
1996
Name of work
Engineering, Procurement & Electro Mechanical Erection works for 6 MW Bio Methanisation Power Project.
Site
Lucknow, Uttar Pradesh, India
Client
M/s. Jeevitha Engineering Pvt.Ltd., Chennai.
Customer
M/s. Asian Bio-Energy Ltd.
Project Duration
8 Months
Our Scope of Work
Engineering, Procurement & Construction of Piping (SS & CS, HDPE,FRP) , Conveyors & Structure. Installation of Electrical Cabling and Cable Tray.
Date of Completion
2003
Name of work
Mechanical Erection works for 3X100 TPH Boiler Nirma Coustic Soda Plant.
Site
Bhavnagar, Gujarat, India
Client
M/s. Lentjes Energy Technik, Germany.
Customer
M/s. Nirma Industries, Gujarat.
Project Duration
19 Months.
Our Scope of Work
Erection of Non Pressure Parts, Air Pre-Heaters, ESP, Structure, Platform & Galleries, Backstays, Lignite Bunkers, Lime Stone Bunkers.
Date of Completion
2000
Name of work
Design, Supply, Fabrication and Erection of EDC Storage Tank for Chemplast Sanmar, Karaikal.
Site
Karaikal, Pondicherry, India
Client
M/s. Chemplast Sanmar Limited, Chennai
Customer
M/s. Chemplast Sanmar Limited, Chennai
Project Duration
7 months.
Our Scope of Work
Design, Supply, Fabrication & Erection of EDC Storage Tanks. (20,000 Cu.M, 45 M Dia and 14.5 M Ht.)
Date of Completion
2004
Name of work
EPC Works for ITC's Primary Manufacturing Division (PMD) in Bangalore.
Site
Bangalore, India
Client
M/s. Bovis Land Lease, Bangalore.
Customer
M/s. ITC, Bangalore.
Project Duration
24 months.
Our Scope of Work
Erection of Steam & Condensate Piping.
billige cosplay kostüme
Date of Completion
2002
Name of work
EPC (Engineering, Procurement & Construction) including Pre-commissioning and commissioning for174 TPD (Tonnes Per Day) Carbon-di-oxide capture (CO2) Plant.
Site
Tuticorin, Tamil Nadu
Client
Tuticorin Alkali Chemicals and Fertilizers Limited
Customer
Tuticorin Alkali Chemicals and Fertilizers Limited
Project Duration
15 Months
Our Scope of Work
Engineering, Procurement, Civil construction,
Mechanical installation works, E&I works
zapatillas nike rebajas
Date of Completion
Sep-2016
Name of work
LSTK of Balance of Plant (BoP) package for 2 X 350 MW Coastal Thermal Power Project.
Site
Krishnapatinam,Andhra Pradesh, India
Client
M/s. CCCL-EDAC Energy Ltd., Chennai.
Customer
M/s. Meenakshi Energy Private Ltd., Noida ( India Power)
Project Duration
30 Months
Our Scope of Work
Design, Engineering, Supply and Erection of Balance of Plant (BoP) Packages
- Coal Handling Package
- Ash Handling Package
- Water System package (CW & ACW, WTP) Fire Detection & Protection System Heat Ventilation & Air Conditioning System
- Piping
- Induced Draft Cooling Tower
- Fuel Oil Handling System fausse sacoche de luxe
- Electrical Balance of Plants (E-BoP) & Switchyard
- Associated Control & Instrumentation works
Date of Completion
Completed
Name of work
Balance of System (BoS) on EPC basis for 24.7MWp capacity floating solar Photovoltaic Power Plant with 5yrs O&M at Tuticorin
Site
Tuticorin, Tamilnadu
Client
M/s. Greenam Energy Private Ltd
Customer
M/s. Greenam Energy Private Ltd
Project Duration
30 Months
Our Scope of Work
-Installation of Floaters, Solar PV Panels (Free Issue)
-Balance of Systems on Engineering Procurement Construction (EPC) basis
-5yrs O&M
Date of Completion
Completed
Name of work
AA
Site
AAA
Client
AA
Customer
AAA
Consultant
A
Project Duration
AA
Our Scope of Work
AA
Date of Completion
AA
Name of work
sd
Site
dsds
Client
dsds
Customer
ds
Consultant
dsdssd
Project Duration
dsdsds
Our Scope of Work
dsdsds
Date of Completion
dfdfsdsfdfdf
Flue-Gas Desulfurization
Name of work
Sea Water Flue Gas De sulphurising System(FGD) for 4 X 300 MW JSW Ratnagiri Thermal Power Plant Project
Site
Ratnagiri, Maharashtra, India
Client
M/s. JSW Energy (Ratnagiri) Ltd
Customer
M/s. JSW Energy (Ratnagiri) Ltd
Project Duration
32 Months
Our Scope of Work
Engineering, Supply & Erection of Sea Water Flue Gas De sulphurising System on turnkey basis.
costumi cosplay anime
Date of Completion
2013