2 x 800 MW Lara Super Thermal Power Plant Project

Name of work : Mechanical Erection, Testing and commissioning of Boiler Unit-1 and BOP Equipment for Lara Super Thermal Power Plant Project for 2x800MW
Site :

Chhattisgarh

Client :

M/s. Doosan, Chennai

Owner :

M/s. NTPC

Project Duration :

34 Months

Our Scope of Work :
  • Boiler & Auxiliaries
  • BOP Equipment Erection

Status

: Ongoing

3 x 350 MW Thermal Power Plant of KVK Nilachal Power Limited, Cuttack, Nilachal, Orissa

Name of work : EPC basis for 3 x 350 MW Thermal Power Plant of KVK Nilachal Power Limited
Site :

Cuttack, Nilachal, Orissa

Client :

M/s. KVK Energy Limited, Orissa

Owner :

M/s. KVK Energy Limited, Orissa

Project Duration :

27 Months

Our Scope of Work :
  • Engineering
  • Supply & Erection of BOP

Status

: Ongoing

4 x 300 MW JSW Thermal Power Project at Ratnagiri

Name of work : Engineering, Procurement and Construction of Sea Water Flue Gas De sulphurising System (FGD) for 4 x 300 MW Thermal Power Plant Project, Ratnagiri,.
Site :

Ratnagiri, Maharashtra

Client :

M/s. JSW Energy (Ratnagiri) Limited, Ratnagiri

Owner :

M/s. JSW Energy (Ratnagiri) Limited, Ratnagiri

Project Duration :

32 Months

Our Scope of Work :
  • Engineering
  • Supply & Erection of Sea Water Flue Gas De Sulphurising System

Status

: Ongoing

2 x 600 MW Mutiara Thermal Power Project at Tuticorin

Name of work : 400 KV GIS for 2 x 600 MW Mutiara Thermal Power Plant Project.
Site :

Tuticorin, Tamil Nadu

Client :

M/s. Coastal Energen Private Limited, Chennai

Owner :

M/s. Coastal Energen Private Limited, Chennai

Project Duration :

18 Months

Our Scope of Work :
  • Civil
  • Mechanical
  • Electrical and Control & Instrumentation

Status

: Ongoing

Conveying Systems at Ennore Port

Name of work : Engineering, Procurement and Construction of Conveying Systems
Site :

Ennore, Chennai

Client :

M/s. SICAL Iron Ore Terminals Limited, Chennai

Customer :

M/s. SICAL Iron Ore Terminals Limited, Chennai

Project Duration :

20 Months.

Our Scope of Work :
  • Engineering
  • Supply
  • Erection
  • Testing & commissioning of 400KV GIS

Status

: Ongoing

2 x 300 MW Meenakshi Energy Thermal Power Project at Krishnapatinam

Name of work : Engineering, procurement and construction of Balance Of Plant of 2 x 300 MW Meenakshi Energy Thermal Power Project.
Site :

Krishnapatinam, Andhra Pradesh

Client :

M/s. CCCL-EDAC Energy Ltd., Chennai

Owner :

M/s. Meenakshi Energy Pvt.Ltd. Noida

Project Duration :

30 months

Our Scope of Work :


  • Engineering
  • Supply & Erection of BOP

Status

: Ongoing

3 x 500 MW NTECL Vallur Thermal Power Project at Kuruvimedu

Name of work : Mechanical Erection works for Unit-3 of 3 x 500 MW Vallur Thermal
Power Project
Site :

Kuruvimedu, Ponnery Taluk Chennai, Tamil Nadu

Client :

M/s. BHEL

Owner :

M/s. NTECL

Project Duration :

35 Months

Our Scope of Work :
  • Structures
  • Pressure parts,Non pressure parts
  • Air preheater,Duct etc.

Status

: Ongoing

3 X 800 MW Super Thermal Power Plant at Kudgi

Name of work : Kudgi super thermal powerproject, Stage-1, Kudgi, Karnataka State
Site :

Kudgi,Karnataka

Client :

M/s.Doosan Power System India Private Limited, Chennai

Owner :

M/s. National Thermal Power Corporation

Project Duration :

34 Months

Our Scope of Work :
  • Erection of Boiler & Auxiliaries of Unit- 2 of 3 x 800 MW Super Thermal Power Plant,Kudgi.
  • Boiler and Auxiliaries

Status

: Ongoing

2 X 600 MW Mutiara Thermal Power Project

Name of work : Mechanical Erection of BTG & Auxiliaries For 2 X 600 MW Mutiara Thermal Power Project
Site :

Tuticorin, Tamil Nadu

Client :

M/s. Coastal Energen Private Limited, Chennai

Owner :

M/s. Coastal Energen Private Limited, Chennai

Project Duration :

20 Months

Our Scope of Work :
  • Boiler & Auxiliaries
  • Steam Turbine Generator & Auxiliaries
  • ESP
  • Electrical and C&I

Status

: Ongoing

2 X 600 MW TNEB Athipattu Thermal Power Plant Project

Name of work : Mechanical Erection works of Boiler for Unit-I Of 2 X 600 MW TNEB Athipattu Thermal Power Plant Project
Site :

Athipattu , Tamil Nadu

Client :

M/s. BHEL, Chennai

Owner :

M/s. TNEB, Chennai

Project Duration :

26 Months

Our Scope of Work :
  • Boiler & Auxiliaries
  • Structures, pressure parts, Non pressure parts
  • ESP, Rotating Equipments
  • Cooling Water Piping

Status

: Ongoing

2 X 600 MW North Chennai Thermal Power Station TNEB Athipattu Thermal Power Plant Project

Name of work : Mechanical Erection ,Testing, commissioning of Balance LP Piping works for Unit-1 &2 Of 2 X 600 MW North Chennai Thermal Power Station TNEB Athipattu Thermal Power Plant Project
Site :

Athipattu, Tamil Nadu

Client :

M/s. BHEL, Chennai

Owner :

M/s. TNEB, Chennai

Project Duration :

12 Months

Our Scope of Work :
  • LP piping Works for Unit 1&2

Status

: Ongoing

2 X 500 MW NTPL Tuticorin Thermal Power Project at Tuticorin

Name of work : Mechanical Erection works for Unit-2Of 2 X 500 MW NTPLTuticorin Thermal Power Project at Tuticorin
Site :

Tuticorin, Tamil Nadu

Client :

M/s. BHEL,Chennai

Owner :

M/s. TNEB & M/s.NLC,Chennai

Project Duration :

22 Months

Our Scope of Work :
  • Boiler & Auxiliaries
  • Structures, pressure parts, Non pressure parts
  • ESP
  • Rotating Equipments

Status

: Ongoing

 

1 X 563TPH PC fired Boiler at M/s.OPG Power Generation Pvt. Ltd. NTPL

Name of work : Mechanical Erection & assistance in commissioning of 1 x 563TPHpc Fired Boilerat M/s.OPG Power Generation Pvt .Ltd NTPL
Site :

Gummidipoondi, Tamil Nadu

Client :

M/s. Isgec Heavy Engineering Ltd.,Noida

Owner :

M/s.OPG Power Generation Pvt.Ltd.,Chennai

Project Duration :

15 Months

Our Scope of Work :
  • Boiler & Auxiliaries
  • ESP

Status

: Ongoing

 

1 X 150MW Nagai Power Project

Name of work : Erection, Testing& commissioning of Boiler for 1 x150 MW Nagai Power Project
Site :

Nagaipatinam

Client :

M/s. NCC

Owner :

M/s. NCC

Project Duration :

16 Months

Our Scope of Work :
  • Boiler & Auxiliaries
  • ESP

Status

: Ongoing

 

2 X 500MW Power Cycle Piping for Simhadri Super Thermal Power Plant

Name of work : Erection works for2 X 500 MW Power Cycle Piping for Simhadri Super Thermal Power Plant
Site :

Andhra pradesh

Client :

M/s. BHEL,Chennai

Owner :

M/s.NTPC

Project Duration :

15 Months

Our Scope of Work :
  • Power Cycle Piping

Status

: Ongoing

 

2 X 250MW Power Lignite based Power Plant Project at Neyveli

Name of work : Mechanical Erection works for2 X 250 MW Power Lignite based Power Plant Project at Neyveli
Site :

Neyveli , Tamil Nadu

Client :

M/s. BHEL,Chennai

Owner :

M/s.Neyveli Lignite Corporation,Neyveli,Tamilnadu

Project Duration :

25 Months

Our Scope of Work :
  • Structure
  • Pressure Parts,Non Pressure Parts
  • ESP,Bunkers,Fans
  • Fuel Oil Systems and Equipments

Status

: Ongoing

 

2 X 250MW CFBC Boiler at NeyveliTPS,Cuddalore(Dis),Tamilnadu

Name of work : Modification of fluidized bed heat Exchangers at Unit -1&2 of NLC TS-II expansion 2 X 250 MW CFBC Boiler at Neyveli TPS, Cuddalore(Dis), Tamil Nadu
Site :

Neyveli ,TPS,Cuddalore,Tamil Nadu

Client :

M/s. Neyveli Lignite Corporation,Neyveli,Tamilnadu

Owner :

M/s. Neyveli Lignite Corporation,Neyveli,Tamilnadu

Project Duration :

20 Months

Our Scope of Work :
  • Modification of Fluidized Bed Heat Exchangers

Status

: Ongoing

 

Furnace Maintenance Jobs in Plants 1,9& 10 during Refinery-1 Shut down at CPCL,Manali

Name of work : Furnace Maintenance Jobs in Plants 1,9 & 10 during Refinery-1 Shut down at CPCL,Manali
Site :

CPCL,Manali

Client :

M/s. CPCL

Owner :

M/s. CPCL

Project Duration :

Furnaces (1F-01A, 1F-01B, 1F-02 & 1F-03)-18 Days,
Plant-9 Furnaces (9F-201 & 9F- 301) - 16 days
Plant-10 Furnaces (10F-101) - 11 Days

Our Scope of Work :
  • Plant-1,9 & 10 Furnaces

Status

: Ongoing

 

Replacement of Cooling Water Piping connected with Cooling Tower-1 & replacement of 1F-01A Air PreHEATER Duct during Refinery Shut down at CPCL,Manali

Name of work : Replacement of Cooling Water Piping connected with Cooling Tower-1 & replacement of 1F-01A Air PreHEATER Duct during Refinery Shut down at CPCL,Manali
Site :

CPCL,Manali

Client :

M/s. CPCL

Owner :

M/s. CPCL

Project Duration :

7 days for Cooling Tower Jobs,
15 days for 1F-01A APH jobs.

Our Scope of Work :
  • Cooling Tower Jobs and APH Jobs

Status

: Ongoing

 

2 X 500 MW Unit-1 &2 at NTPL Tuticorin Power Project at Tuticorin

Name of work : Erection,Testing and commissioning of Electrical Package for Unit-1&2Of 2 X 500 MW NTPLTuticorin Power Project at Tuticorin
Site :

Tuticorin, Tamil Nadu

Client :

M/s. BHEL,Chennai

Owner :

M/s.NLC Tamilnadu Power Limited (NTPL)

Project Duration :

12 months

Our Scope of Work :
  • Electrical Erection Works

Status

: Ongoing

 

2 X 525MW at Malibrahmani TPP(Monnet),Angul,Odisha

Name of work : Erection,Testing and commissioning of Electrical Package Of 2 X 525 MW at Malibrahmani TPP(Monnet),Angul,Odisha
Site :

Angul,Odisha

Client :

M/s. BHEL,Chennai

Owner :

M/s.Monnet Power

Project Duration :

12 months

Our Scope of Work :
  • Electrical Erection Works

Status

: Ongoing

 

Electrical & Instrumentation Works for Strategic Storage of Crude Oil at ISPRL

Name of work : Electrical & Instrumentation Works for Strategic Storage of Crude Oil at ISPRL
Site :

ISPRL

Client :

M/s. Linde Engineering India Private Limited

Owner :

M/s.Indian Strategic Petroleum Reserves Ltd(isprl)

Project Duration :

16 months

Our Scope of Work :
  • Electrical & Instrumentation Works

Status

: Ongoing

 

5 X 270MW Thermal Power Plant, Amravati

Name of work : Erection,Testing and commissioning and handling over of C&I Works for Boiler & its Auxiliaries,Turbo Generator & its Auxiliaries,StationC&i for Unit #4 and #5 of 5 X 270MW Thermal Power Plant,Amravati
Site :

Amravati

Client :

M/s. BHEL

Owner :

M/s.India Bulls Power Limited

Project Duration :

16 months

Our Scope of Work :
  • C&I Erection Works

Status

: Ongoing

 

2 X 150MW OPG Kutch Project at OPG Power Gujurat Pvt. Ltd. Bhadreshwar , Gujurat

Name of work : Electrical works and C&I package for HSRG & its auxiliaries,GTG& its auxiliaries,Station C&I for 2 X 150MW OPG Kutch Project at OPG Power GujuratPvt. Ltd. Bhadreshwar,Gujurat
Site :

Bhadreshwar,Gujurat

Client :

M/s. BHEL,PSWR

Owner :

M/s.OPG Kutch Power

Project Duration :

13 months

Our Scope of Work :
  • C&I Electrical Works

Status

: Ongoing

 

Erection,Testing and commissioning of Balance Controls & Instrumentation works for MRPL Phase-III 122 MW Co-generation CPP at Mangalore,Karnataka

Name of work : Erection,Testing and commissioning of Balance Controls & Instrumentation works for MRPL Phase-III 122 MW Co-generation CPP at Mangalore,Karnataka
Site :

Mangalore,Karnataka

Client :

M/s. BHEL,Chennai

Owner :

M/s.MRPL,Mangalore

Project Duration :

12 months

Our Scope of Work :
  • C&I Works-Associated fabrication & erection works-panels,cabling,impulsepipe,tubing,instrumentsetc

Status

: Ongoing

 

1 X 30MW GTG + 1X 125 TPH HRSG Based co-gen,IOCL.(IRUP),GujuratRefinery,IOCL.Vadodara Project(GT#6) At IOCL GujuratRefinery,Vadodara

Name of work : Electrical package 1 X 30MW GTG + 1X 125 TPH HRSG Based co-gen,IOCL.(IRUP),GujuratRefinery,IOCL.Vadodara Project(GT#6) At IOCL GujuratRefinery,Vadodara
Site :

Vadodara,Gujurat

Client :

M/s. BHEL,PSWR

Owner :

M/s.IOCLGujurat Refinery

Project Duration :

8 months

Our Scope of Work :
  • C&I Electrical Works

Status

: Ongoing

 

Conveying system for the SICAL Iron Ore Port Terminal at Mangalore PORT,Mangalore

Name of work : Design & Detailed Engineering ,Supply, Civil Works, Erection, Commissioning and Test run for conveying system for the SICAL Iron Ore Port Terminal at Mangalore PORT,Mangalore
Site :

Mangalore

Client :

M/s. SICAL Iron Ore Terminals Limited,Mangalore

Owner :

M/s.SICAL Iron Ore Terminals Limited,Mangalore

Project Duration :

18 months

Our Scope of Work :
  • EPC Contract for conveyor Systems

Status

: Ongoing

 

 