DREDGING OF SEAWATER OUTFALL
Dredging of Seawater outfall at 2 X 350 MW Coastal Thermal Power Project, MEL, Nellore
EDAC Engineering Limited (formerly known as SPIC JEL Engineering Construction Limited) incorporated in the
year 1987.
EDAC Engineering Limited is certified with
♦ ISO 9001:2008 for Quality Management System
♦ ISO 14001:2015 for Environment Management System
♦ OHSAS 18001:2007 for Occupational Health & Safety Management System
Read More >>
We are very happy with the service EDAC provides. They are contactable seven days a week and their response times are excellent, which keeps our down time to a minimum.
Just to say we are really impressed with the way you have sorted things for us today and the internet seems superfast compared with how it has been. Thank you.
Dredging of Seawater outfall at 2 X 350 MW Coastal Thermal Power Project, MEL, Nellore
Installation, Testing, Commissioning of 6.6KV, 11KV Substation Equipment in CACP II Substation & PDC VII Substation at IGCAR,
Extension of different services for execution of Rural Electrification works in the district of Kandhamal, Odisha - RGGVY -12
Balance works of Package-B (CCR & Unit#2) of Structural steel works for 2 x 500 MW at Neyveli New Thermal Power Station ,Neyv
EDAC successfully achieved full load in Unit #1 800 MW at 2X800 MW Super Thermal Power Project at NTPC LARA.
EDAC Successfully completed Generator Stator Lifting weighs 360 MT at 2x660 MW NTPC TANDA PHASE II
EDAC celebrated 47th National Safety Day Celebrations in HO.
EDAC Celebrated International Women's Day at HO.
EDAC successfully completed Main Steam Piping External Hydro Test on 02/03/2018 at 2X500 MW Neyveli New Thermal Power Project
EDAC Participated in the INDEE THAILAND Industrial Fair 2018 at Bangkok, Thailand. Mr. M Nandakumar our Managing Direc
EDAC is participating in INDEE Thailand 2018 Industrial fair at Bangkok, Thailand on 1-4th February 2018. We are interested t
EDAC successfully completed one of a Major Milestone Activity of Auxiliary Boiler Light up at 2 x 500 MW Thermal Power Proje
EDAC started the new project of Rural electrification works involving 11 KV & LT Lines at Gosani block under RGGVY at Gajapat
EDAC celebrated New Year 2018 by a brief speech by our Managing Director Mr M Nandakumar.
We have successfully completed the BOILER DRAINABLE HYDRO TEST on 26-12-2017 at 2x660MW,IB TPS-OPGCL, Banharpalli, Odisha
We have successfully completed the Generator rotor (45 MT) insertion, the most critical activity in TG erection at 1x150MW Na
We have successfully Pre-commissioned WTP Package -SWRO High pressure Pump and Skid-A at 2x350 MW costal Thermal Power Pro
Thiru P Thangamani, Minister of Power, Government of Tamilnadu along with our Managing Director, Mr M Nandakumar visited our
EDAC has completed the Turnaround Maintenance of Ethylene Unit-2 in Equate Petrochemical Company K.S.C., Kuwait by 48 hrs ahe
EDAC successfully erected the Turbine rotor assembly weighs (50.61MT) at 1x150MW NPPL Site, Nagapattinam
EDAC successfully completed the 72 hours COD in the first time attempt without any stoppage of the boiler, one of the most s
EDAC Organised Training Programme for Management Trainees 2017 at M/s Asha Nivas, Chennai from Sep 8 to Sep 19, 2017
We have been awarded the prestigious Silver Prize from FICCI for "Safety Systems Excellence" on 23/08/17 in a ceremony at FIC
BHEL-MEIL Tuticorin Site; EDAC Engineering Ltd successfully completed the first & foremost milestone activity " Erection of a
Mr M Nandakumar has been elevated to Managing Director of our company with effect from 1st August 2017
EDAC Engineering Limited successfully commissioned AONLA-II new substation with presence of senior IFFCO officials